4. PT Thiess Contractor
Posisi:
- Project Controls Engineer (2007-2008)
- Project Controls Engineer (2005-2007): ConocoPhillips Suban EPC Phase 2 Gas Project.
(*)
4. PT Thiess Contractor
Posisi:
- Project Controls Engineer (2007-2008)
- Project Controls Engineer (2005-2007): ConocoPhillips Suban EPC Phase 2 Gas Project.
(*)
Source :Kompas.com tribunnews
Editor : Grid Hot
Baca Lainnya
Latest